apps1.dot.illinois.gov - /eplan/desenv/standards/District 3/D3SpecialProvisions/


[To Parent Directory]

5/28/2024 5:04 AM 42968 0 - D3 SPECIALS CHECK SHEET January 1, 2022.docx
5/28/2024 10:06 AM 17689 1A - TITLE PAGE.docx
3/3/2023 3:21 PM 13780 1B - STATUS OF UTILITIES TO BE ADJUSTED.docx
11/19/2013 4:12 PM 25088 1C - REPAIR AND MAINTENANCE OF HAUL ROADS.doc
11/19/2013 4:11 PM 23040 1D - HAUL ROADS.doc
12/22/2015 9:24 AM 26112 1F - INCENTIVE PAYMENT PLAN NO 1.doc
12/22/2015 9:23 AM 26624 1G - INCENTIVE PAYMENT PLAN NO 2.doc
3/3/2023 3:28 PM 15294 1H - WETLAND AREAS.docx
3/3/2023 3:30 PM 19212 1I - MAINTENANCE (CORP OF ENGINEERS NWP#3).docx
3/3/2023 3:31 PM 14943 1J - TEMPORARY CONSTRUCTION WATERWAY PERMITS (CORPS OF ENGINEERS).docx
3/3/2023 3:32 PM 15492 1K - TEMPORARY CONSTRUCTION WATERWAY PERMITS (IDNR).docx
3/3/2023 3:33 PM 12505 1L - COMPLETION DATE.docx
3/3/2023 3:33 PM 14391 1P - COMPLETION DATE PLUS WORKING DAYS.docx
12/23/2015 11:40 AM 16658 1Q - ROAD CLOSURE WITH COMPLETION DATE.docx
11/8/2021 10:54 AM 14323 1S - CONSTRUCTION LAYOUT SPECIAL (ADA).docx
11/8/2021 10:56 AM 14134 1T - UTILITY RELOCATIONS AND DELAYED START DATE.docx
3/3/2023 3:36 PM 13556 2A - EXCAVATING AND GRADING EXISTING SHOULDER.docx
3/27/2023 9:55 AM 13712 2C - FURNISHED EXCAVATION.docx
3/3/2023 3:39 PM 14161 2E - EXPLORATION TRENCH, SPECIAL.docx
3/3/2023 3:42 PM 13304 2F - MULCH METHOD 2.docx
3/27/2023 9:59 AM 20344 2H - ROCK FILL.docx
3/30/2023 5:09 AM 15664 3B - WHITEWASHING FOR CONCRETE PAVEMENT.docx
3/30/2023 5:13 AM 14768 3C - PREPARATION AND RESTORATION OF SIDEWALK WORK AREAS.docx
3/3/2023 3:48 PM 12505 4A - AGGREGATE SURFACE COURSE TYPE B.docx
3/3/2023 3:55 PM 26667 4B - PAVEMENT PATCHING.docx
12/22/2015 9:40 AM 16706 4C - GROWTH CURVE.docx
3/27/2023 12:35 PM 14137 4F - SURFACE COURSE PAVING SEQUENCE.docx
12/22/2015 9:41 AM 13754 4G - VIBRATORY ROLLER RESTRICTION.docx
3/30/2023 5:14 AM 13977 4H - PORTLAND CEMENT CONCRETE PAVING REQUIREMENTS.docx
3/30/2023 5:15 AM 12906 4J - CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE.docx
3/3/2023 3:58 PM 12898 4K - AGGREGATE SHOULDERS TYPE B.docx
3/27/2023 12:39 PM 22105 4L - APPROACH SLAB REPAIR.docx
3/27/2023 12:51 PM 14655 4N - HOT-MIX ASPHALT PAVEMENT PATCHING (PARTIAL DEPTH).docx
3/27/2023 12:53 PM 14389 4O - RUMBLE STRIP AT INTERSECTIONS.docx
3/3/2023 4:07 PM 13962 4P - RAISED JOINT REMOVAL.docx
11/8/2021 11:34 AM 12869 4T - DRAINAGE MITIGATION ON MILLING AND RESURFACING PROJECTS.docx
3/3/2023 4:11 PM 13295 4U - HOT MIX ASPHALT MOW STRIP.docx
8/21/2023 8:25 AM 13341 4V - DELIVERY AND STORAGE OF CRACK FILLING.docx
4/5/2024 6:14 AM 14751 4W - HOT MIX ASPHALT SURFACE REMOVAL (DECK).docx
4/5/2024 6:13 AM 38912 4X - DRILL AND GROUT #6 OR #8 EPOXY COATED TIE BARS.doc
3/27/2023 1:41 PM 17527 5A - BRIDGE DECK CONCRETE SEALER.docx
3/3/2023 4:18 PM 13850 5C - STORM SEWER, RUBBER GASKET.docx
3/27/2023 1:57 PM 14649 5D - STORM SEWER (WATER MAIN REQUIREMENTS).docx
3/27/2023 2:04 PM 14324 5E - STORM CULVERT OR CULVERT TO BE FILLED.docx
4/5/2024 6:45 AM 13514 5F - BRIDGE DECK LATEX OR MICROSILICA CONCRETE OVERLAY CUT OFF DATE.docx
9/5/2023 9:30 AM 15245 5G - MASTIC REPAIRS FOR CULVERTS.docx
3/3/2023 4:23 PM 12592 6A - PERMANENT SURVEY MARKERS.docx
3/27/2023 2:08 PM 14272 6G - FRAMES AND LIDS TO BE ADJUSTED SPECIAL and WATER VALVES TO BE ADJUSTED SPECIAL.docx
3/3/2023 4:25 PM 14502 6H - SHOULDER STABILIZATION AT GUARDRAIL.docx
11/8/2021 11:53 AM 15313 6I - HIGH TENSION CABLE MEDIAN BARRIER - DRIVEN LINE POSTS.docx
3/27/2023 2:12 PM 27013 7AB - LINEAR DELINEATOR PANELS, 6 INCH.docx
3/27/2023 2:13 PM 14712 7AE - PAINT PAVEMENT MARKING - TWO APPLICATIONS .docx
7/16/2024 10:09 AM 25443 7AF - LINEAR DELINEATOR PANELS, 4 INCH.docx
3/30/2023 5:51 AM 15062 7AG - MODIFIED URETHANE PAVEMENT MARKING - TWO APPLICATIONS.docx
4/3/2023 8:30 AM 19301 7AH - LINEAR DELINEATION PANELS (TEMPORARY BARRIER WALL).docx
3/30/2023 5:51 AM 20060 7AI - SMART TRAFFIC MONITORING SYSTEM.docx
3/30/2023 5:53 AM 14875 7AJ - CONTROL OF WORK - SMART WORK ZONE.docx
3/30/2023 5:54 AM 13675 7AK - CHANGEABLE MESSAGE SIGN (SPECIAL).docx
3/30/2023 5:55 AM 15588 7AL - TEMPORARY RUMBLE STRIPS (SPECIAL).docx
3/3/2023 4:31 PM 14952 7B - WIDTH RESTRICTION SIGN.docx
3/3/2023 4:33 PM 12322 7C - VEHICLE PARKING.docx
3/27/2023 2:16 PM 16782 7E - TEMPORARY BRIDGE TRAFFIC SIGNALS.docx
12/10/2009 2:29 PM 12721 7F -KEEPING ROADS OPEN TO TRAFFIC.docx
3/3/2023 4:37 PM 12643 7G - CHANGEABLE MESSAGE SIGN.docx
12/10/2009 2:31 PM 10908 7H - UNEVEN LANES.docx
3/3/2023 4:38 PM 14082 7I - TRAFFIC CONTROL SURVEILLANCE.docx
3/27/2023 2:18 PM 13670 7J - TRAFFIC CONTROL IN VICINITY OF RR GRADE.docx
3/3/2023 4:39 PM 12728 7L - PLASTIC DRUMS.docx
10/29/2019 6:26 AM 14301 7M - DIRECTION INDICATOR BARRICADES.docx
3/27/2023 2:20 PM 14630 7Q - ALTERNATE ROUTE SIGNING.docx
3/27/2023 2:22 PM 14924 7S - TEMPORARY INFORMATION SIGNING.docx
3/27/2023 2:23 PM 17111 8A - LOOP DETECTOR TESTING.docx
3/3/2023 2:59 PM 13200 8B - SERVICE INSTALLATION.docx
4/12/2023 12:32 PM 19754 8E - FULL-ACTUATED CONTROLLER AND TYPE IV CABINET CABINET, SPECIAL.docx
3/27/2023 2:25 PM 18447 8G - OPTIMIZE TRAFFIC SIGNAL SYSTEM.docx
3/3/2023 3:12 PM 14244 8H - FIBER OPTIC CABLE IN CONDUIT.docx
3/3/2023 3:14 PM 16498 8I - RE-OPTIMIZE TEMPORARY TRAFFIC SIGNAL SYSTEM.docx
3/3/2023 3:20 PM 15659 8J - RESTORATION OF WORK AREA.docx
3/3/2023 3:20 PM 18192 8L - ELECTRICAL SERVICE INSTALLATION - TRAFFIC SIGNALS.docx
3/30/2023 5:38 AM 14241 8M - ROD AND CLEAN EXISTING CONDUIT.docx
9/5/2023 12:23 PM 36349 8N - VIDEO VEHICLE DETECTION SYSTEM.docx
9/5/2023 12:24 PM 36889 8O - VIDEO VEHICLE DETECTION SYSTEM WITH REMOTE ACCESS.docx
9/5/2023 12:43 PM 20997 8P - REMOTE CONTROLLED TRAFFIC SIGNAL AND VIDEO SYSTEM.docx
8/5/2024 10:15 AM <dir> Revision Memos